Construction preparation requirements for thermal insulation decorative panels.

Construction preparation requirements for thermal insulation decorative panels.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2020-06-11
  • Views:0

(Summary description)At present, as a new type of energy-saving building material, integrated thermal insulation decorative board has been consistently praised and widely recognized by customers. Then, let's take a look at what preparatory work needs to be done before construction.

Construction preparation requirements for thermal insulation decorative panels.

(Summary description)At present, as a new type of energy-saving building material, integrated thermal insulation decorative board has been consistently praised and widely recognized by customers. Then, let's take a look at what preparatory work needs to be done before construction.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2020-06-11
  • Views:0
Information

At present, as a new type of energy-saving building material, integrated thermal insulation decorative board has been consistently praised and widely recognized by customers. Then, let's take a look at what preparatory work needs to be done before construction.
1. Material preparation: 1. Main material: thermal insulation decorative board; auxiliary materials: adhesive, water retaining agent, interface agent, side sealant, fastener; accessories: high weather resistance neutral silicone rubber, textured paper Wait.
The second is to use a hanging basket or scaffolding for construction. Specific requirements: the installation of the hanging basket must comply with safety regulations, and the inner side of the hanging basket must be equipped with elastic gaskets to avoid damaging the installed thermal insulation decorative panels when the hanging basket is raised and lowered; the scaffolding frame pipe and pipe head The distance between the wall and the wall is 300~450mm to facilitate construction.
The third is the requirements for personnel tools: on-site construction tools, wood board cutting machine (for 201 series, requirements: motor power above 3KW, speed not less than 4000r/min, diamond saw blade, saw blade diameter greater than 300mm), portable cutting machine ( Power 500W or more, alloy tooth saw blade, saw blade diameter 200mm~250mm), flat shovel, mortar tray, adjustable suction cup, ash bucket, elastic ink fountain, pull wire, wire cone, portable electric mixer, glue gun, etc. On-site testing equipment: 2M feet , Feeler gauge, laser marker, steel ruler, tape measure, etc.; personnel requirements: each team is equipped with 30 construction personnel (per 10,000 square meters, construction period of 60 days), including 1 team leader, responsible for the overall progress of the site, safety measures, Construction quality and schedule management; construction personnel should conduct training on products, processes, construction procedures, construction quality and safety management before construction.
The fourth is operating conditions. The size and quantity of the thermal insulation decorative board are consistent with the arrangement of the circuit board layout. Specific application parts and numbers are marked on the back of each board. The size of the board marked on the bill of lading is the actual size of the visible board surface of the finished product (no gap); the main structural wall foundation treatment is completed to achieve and meet the permitted construction conditions; the wall electrical appliances, fire fighting and drainage facilities have been completed and hidden The items were pre-inspected and accepted.